2011年3月9日星期三

super automatic extension of time for erection penis Pumps -

super automatic extension of time for erection penis Pumps -

This product is a top assistant Bo Siu Pong device, for regulating the endocrine, improve and extend the penis erection penis erection time.

How it works:

Penis congestion will naturally be hard up, normal blood vessels in the penis will tighten the valve to maintain the penis congestion, to make the penis function of the valve has been closed out. The blood into the penis pump can then narrow the base of the penis ring will squeeze the blood vessels, thereby keeping the penis firm.

How to install narrow ring:

Select the appropriate narrow ring, the vacuum erection device constriction rings are an important part. Should choose the appropriate narrow ring, so that an erection. Constriction ring to be wrapped around the penis, should be close and comfortable. (Preferred using the maximum number of narrow rings, and gradually narrowed in the use of small rings, in order to achieve the best.)

1, the first pillar and the middle cone ring connection, and then connected with the penile tube.
2, with the handle top and the roots hold the narrow ring. Expand and tapered pillars along narrow ring down to the middle part of the narrow ring fixed.
3, the end of the penis painted with water-soluble lubricant to make it seal better. Then remove the cone-shaped pillars in the middle ring.

How to use the sleeve vacuum (ie vacuum):

1, the penis into a narrow ring installed sleeve, pressed the sleeve body to ensure that narrow rings with the body perpendicular to the handle, a hand grip pump handle to start the vacuum pump switch. To ensure the safety of users, vacuum pump will automatically limit the vacuum pressure 250 mm Hg or less. Slowly finding that the penis firm and feel comfortable amount of vacuum pressure.
2, the penis hardens, keeping the penis tube close to the body. Press the handle at the back of the vacuum pump discharge valve releases the vacuum.
3, the penis is removed from the middle ring. You can enjoy the earthly paradise of love the world!
4, after intercourse, narrow rings will start narrowing the ring from the penis can be removed.

Effect
Used to help patients with erectile impotence penis erection penis and extend the time.

Specification: a loaded, containing the sleeve (ie, vacuum), electric pumps, marked with the number of three narrow rings, soft cover, ring expansion, and the use the instruction manual and leather carrying bag each one. Packing size: 29.3 * 20.5 * 12.3cm

http://xtoysasia.com/super-automatic-extension-time-erection-penis-pumps-p-1236.html

$69.07

没有评论:

发表评论